Friday, 31 January 2014

Golf Course Management
Preventing Course Damage and wear

Given the amount of rain and bad weather we have experienced over the winter period and all things considered, both courses have stood up remarkably well so far. With frequent monitoring of known areas of intense traffic and the use of ropes and hoops we are able to control damage through traffic to a managed level.

As we are fast approaching the spring and the onset of more favorable conditions it would be great if you could help us improve the conditions further especially sensitive areas around greens, tees and fairways, your assistance as members will help enormously in improving conditions going into the spring.

From now until the spring is when the greatest damage can occur, with very little growth and with areas that have had constant traffic on them all winter it is even more important for us all to spread the wear as even as possible. When playing over our courses if you could pay attention to roped off areas and hooped areas and avoid trying to travel through these areas especially close to greens, it would help greatly.

If you could also be extra cautious with your trolley’s particularly around greens and aim to keep well away from the putting surfaces and tee tops, divert around any wet or worn areas on fairways, this would be very much appreciated.

It would also be greatly appreciated if you could make sure you repair your pitch marks and remind your playing partners to do so also. We all want the best putting surfaces we can get and the repairing of pitch marks goes a long way in achieving this.

If we can all work together and hopefully with some improved weather conditions around the corner then we can all look forward to improved conditions in the spring.

Another area that we are looking into is the amount of divots in certain areas of the fairways; one particular problem area is the 7th Highgate. Here the natural contours encourage the majority of drives into one area. To over come this we will be using a mat system where by when you find your ball in a marked area of the 7th fairway you will be obliged to place your ball on a mat provided and play from that mat. This will help to prevent wear at this time of year and aid recovery coming into the spring. This will be used on other areas of the course where needed..

Jonathan Wood
Course Manager
07977448149

Repairing Pitch Marks

Always remember, if your shot hits the green on the fly, there will be an element of damage. Find it, repair it, then look for and repair at least one other that someone else missed. If you notice any ball mark on the green that needs fixing, fix it.
Never take your pull-cart over white lines or across tees or greens, or across the fringe between the green and a greenside bunker. Always move your cart to a spot between the green and next tee before proceeding to the green to putt.

Friday, 17 January 2014

Course Managers January Report


Course Management
Course Manager’s report for January 2014

Annual weather report

Firstly, a belated Happy New Year to you all as we tentatively take a soggy step into 2014!
Before I go onto my report I thought we could have a quick look back at 2013.

The GDD data for 2013 picks out the growth conditions perfectly with a flat start to the year, in essence the grass plant grew better in January than it did in February or March. The winter was long and hard, but in reality it didn’t start until mid-January (be warned).
It wasn’t until mid-April that the weather changed for the better, curiously enough in exactly the same week it changed for the worse in 2012! By July we were flying and enjoyed a heady 3 weeks of hot, dry weather, with Ireland hitting record temperatures.
We had rain in August, kept the good temperature and rolled on into September still tickling along nicely. October was exceptionally mild, with nearly the same growth conditions as September, but with a lot more rain at the end of the month. (Although the rainfall figures for Enville represent one of the driest records for 2013). The temperatures dropped off a cliff in early November as we went into a sustained period of dry, cold conditions. This finished in early December as we picked up milder, westerly winds, but unfortunately these whistled over some intensely deep lows, so the year finished off very windy and very wet.
What an interesting year, but mercifully a better one for most of us after the hard start, though I know a lot of courses were closed over Christmas (and remain so).
So it’s best foot forward into the new year and let’s see what it has in store for the rest of January, however that said we have already experienced over 50mm rain to date in January (2 inches)!

Course restrictions over the last month have been minimal given the volume of rain we have experienced. The Course has been closed on two occasions and temporary greens being used intermittently on specific holes due to either the surround to the green has been waterlogged or the green itself has become too soft for play to commence.

Fine Turf Management

During this stage of the winter it is very much a case of making sure the fine turf surfaces are in as good health as is to be expected at this time of year. If the greens are healthy coming out of the winter, then they will respond well during the spring period.

Management practices employed to create a healthy sward will include timely aeration in terms of slitting, then once we are through January, we use solid pencil tines which are less disruptive to the surface. Regular applications of chelated iron and seaweed help to keep the grass plant healthy and ready for the spring feeding to begin.

We are currently cutting the greens on average once per week at 5.5mm which helps to smooth the surfaces as we are not removing large amounts of grass, however, since December 20th 2013 we have been able to get onto the greens with pedestrian mowers on two occasions and slit aeration in this period has been completed twice also. Rolling will be deployed, when possible given underlying ground conditions, this will help maintain surface levels. During February and if conditions allow, we will give the greens a light top dressing which will signal the start of our spring programme. This early dressing also helps to fill in any scarring caused by disease or pitch marks, and we expect to apply in the region of six tones of material per course with this application.

Renovation and Improvement Projects

Work has progressed well on both courses over the last month with all the planned renovation and improvement projects.

15th Lodge Green Surround and bunkering – All new bunkers are now constructed along with contouring. The turfing will be completed over the coming weeks. We are really pleased with the finished work as it has changed a reasonably bland hole into an interesting and more appealing golf hole.

6th tee Lodge – The constructed of a new tee which was planned for last year will commence during the coming weeks.

13th tee improvements (Highgate) – The new sleeper edge has been installed and the teeing area which was renovated is now ready for turf, which we hope to complete during the week commencing 20th January.

General turf replacement/repairs – We have completed a large amount of repair work around all playing surfaces and this will continue through the majority of February.

The removal of rank grass from around bunkers banks and contouring has also progressed well and this again will continue into next month.

Environmental Management

During periods of weather which restricts the general construction/renovation work, we are able to keep on top of our Stewardship Scheme through Natural England with some important thinning work undertaken as necessary to also sustain good growing conditions for our fine turf surfaces.

The main focus of our thinning work over the coming years will be centered around holes 4-12 on the Lodge course where the long-term aim is to reduce the amount of pine trees and increase the number of indigenous broadleaved trees and to also promote the generation of more heathland within this area.

As you may well be aware, the 4-12 area on Lodge was once a heathland with the heathland being used to plant these pine trees as part of the war effort. This was the case for many heathland areas throughout the country, especially in counties such as Dorset where there were massive areas of heathland demolished with this type of planting. However, that said with heathland being top of the Biodiversity Action Plan and acknowledged as a very valuable resource in terms of wildlife and environment, there are many areas of the country including Enville and Staffordshire, which are actively trying to restore areas of heathland with government funded financial help.

General

We continue to repair lots of pitch marks on the greens on a daily basis, I am aware that the greens have been a little softer than expected due to the persistent rain recently but it remains a problem amongst golfers not repairing pitch marks. In general as I reported at the last meeting general etiquette in terms of repairing pitch marks, adhering to traffic routing and taking an interest in protecting our courses seems to be declining. I will be implementing the protection of fairway areas again this year starting at the beginning of February on selected areas and will also make traffic routing and the protection of areas a priority over the coming months.


Jonathan Wood
Course Manager
Enville Golf Club
07977448149

Monday, 23 December 2013

As I write this post we are experiencing some very wet and windy weather not very seasonal!
We are taking this opportunity when we are limited with the jobs we can complete out the courses to get some much need work completed inside the maintenance facility. Tee balls are beginning painted along with all hazard markers, this will be an ongoing process through the winter period.


We are also continuing getting the new workshop ready by painting the walls.


The area used to be a storage area at the rear of our staff facility, as it is larger and more easily accessed we are making this into our new workshop area. We can then move the grinding units and workshop machinery into this new area.The old workshop will give us an area to store large pieces of machinery such as tractors and aeration equipment.

Over the last two weeks we have been able to strip out a number of areas of rank grass around bunker contouring which made ball retrieval difficult and detratced from the heathland look of wispy fescue grasses. We have also at the same time planted heather into some of the faces giving and even greater natural look, the fecue turf we have used to replace the rank coarse grass has come from our own turf nursery.


The picture above shows the start of the process with all the rank grass removed and the fescue and heather being put into the face and surround.
The picture below shows the job completed, this type of work will continue over the coming weeks. 
The alterations to the 15th Lodge Green surround have also progressed well with the Left hand side of the greens now being shaped and turfed, the front left bunker has been constructed and turf as the picture below shows. Our aim is to finish this project early in the new year.

General maintenance has continued including further slit aeration to the greens,collars and aprons being completed along with pedestrian cutting of greens and raking of bunkers.

I have mentioned on many occasions the importance of tree thinning around playing surfaces to improve air and light penetration onto the plaing surfaces which in turn help create a better environment for the finer grasses to flourish. One other point which is sometimes overlooked is with tree clearing you increase the ability of early morning sun thaw surfaces during frosty conditions, below is a picture of the 4th Green on highgare, a green which we have completed some tree thinning work but from the picture it is clear we need to do more! You can clearly make out the areas of frost behind the tree cover.

Finally I would like to wish you all a very Happy Christmas and a prosperous New year. Thank you for your continuing support.

Friday, 13 December 2013


Over the last three weeks we have experienced some fantastic weather for the time of year, this has enabled us to progress nicely through both our construction/renovation work and our maintenance work. Aeration is avery important part of our management of all the playing surfaces it enables the rootzone dry out and any moisture to peculate through the soil profile easily and most importantly it enables the soil to breath and therefore the turf remains healthy through the winter period. The turf can also send down deeper roots when conditions allow. Over the past month and a half we have managed to slit aerate the greens and collars five times and we will aim to complete this process another two times before the new year.


As i have mentioned in previous post at this time if year it is very important to keep playing surfaces tidy and pedestrian mowing helps in this regard along with gently rolling the surface and producing a better quality of cut. The greens are pedestrian cut as and when needed but we aim for twice during the week at 5.5mm. The tees are cut once every two weeks at 10mm.  


We are now on top of leaf clearing which has taken many hours but thankfully we have seen the back of that process. other jobs completed on the courses have been topping up bunkers with sand and making sure levels are where they should be.


One area we are focusing over this winter is to strip out unwanted coarse grass from around bunker banks and surrounding contouring. We are replacing this coarse grass with finer fescur turf which we grow on our own turf nursery. The finer fescue grass which dominates the heathland site naturally is far easier to retrieve golf balls from and give the authentic natural look to our bunkers. the picture below is the work completed around the 11th Highgate fairway bunker.





Finally another great view this month across the 2nd on the Lodge Course.

Friday, 22 November 2013

Work on the 15th Lodge has progressed well over the last two weeks, the right hand side existing approach bunker has been renovated. The new fairway bunker on the left hand side is almost complete.

Existing right hand approach bunker half way through its make over.


Existing right hand approach bunker finished ready for sand.

This year we are using heather plugs from a specialist nursery to supplement our heather for use around bunkers and in contouring work. Picture above shows some very healthy looking Calluna Vulgaris plugs ready for planting in the 15th Lodge bunkers.


We have made the most of the weather this week and begun our annual heather cutting and harvesting seed. the picture above shows the machine used for this process. The heather is cut on a two year rotational basis and the seed is collected and used for heather regeneration around the courses. We also supply heather seed to a number of local course who are trying to establish heather, some seed also goes to Natural England sites and Wildlife trust sites to help with heather regeneration.


Amongst other jobs we try to complete on a regular basis is hand mowing tees, we feel this helps to provide good presentation throughout the season and especially during the winter months. We aim to pedestrian cut greens two-three times per week with rolling taking place once per week and tees get cut once per week.


I will leave you with this picture, there are some great views early in the morning.

Friday, 8 November 2013

The last few weeks has seen work on the golf courses slowly change from focusing on regular conditioning through to more focused improvement work as we are now approaching the winter months. All Greens were verti drained using 12mm solid tines at the end of October, this will be our last deep aeration of the year as we will now be focusing on slit tines every two weeks. This will be completed on both Greens and tees.
Verti draining greens

All greens are currently being cut at 5mm our preferred winter height with pedestrian mowers. We aim to cut greens three times per week at the moment as growth has really reduced, we also roll once per week to maintain surface smoothness. As part of our winter management of the greens, collars and aprons they receive monthly applications of Chelated iron and seaweed to keep the grass plant healthy through the winter period without encouraging growth.




Spraying Greens.

Pedestrian mowing is also the preferred option on tees throughout the winter period as we feel the presentation is far greater and the action on the turf is far less severe.


The planned programme of renovation and improvement is also underway with the alterations to the 15th Lodge being the first project. The approach bunker is the first to be constructed and then we will be improving all the greenside bunkers. All of the existing bunkers will be taken out and replaced with two new greenside bunkers improving both the playability of the hole and the aesthetics.


This was the first cut in the ground.


The new approach bunker almost ready for turf.
We have also competed planned drainage work to the fairway feature on the 8th Highgate along with stripping out rank turf and replacing with fine fescue turf.

Presentation of both courses always remains a high priority even during the winter months and the picture belows shows how good the course can look in the winter.



Friday, 1 November 2013

Course Managers Report for October

Course Management Course Manager’s report for October 2013 Fine Turf Management The greens are currently being cut at 4.5mm with rolling taking place twice each week; as we move into November, the height will increase to 5mm. We have recently taken delivery of a new greens roller which will enable us to roll on both courses simultaneously if required now that we have two rollers. Throughout the year we have the valuable option to roll instead of mowing, whilst still maintaining the greens speed; over the long term, this will reduce stress on the turf and improve the quality of the sward. We aim to pedestrian mow as many times as possible during every week, as this gives us a much improved finish and increases pace dramatically; throughout the winter period, greens are only cut with pedestrian mowers. Over-seeding success – As you have probably seen on the greens, the percentage of seed which has germinated and is now growing within the sward is excellent. The drill lines are very clear to see. The success of over-seeding is important in the future development of the sward and builds on the work already completed. Further, as a direct consequence, the ultimate goal of bent and fescue dominated greens is brought very much closer. We have recently completed some heavy verti drain work on the new 11th green on Highgate. This work was discussed with Alistair Beggs (Agronomist) during his visit on the 7th October 2013. We have used 24mm tines to a depth of 300mm minimum to alleviate the compaction deep in the soil profile. These holes were then filled with top dressing. The initial signs are very good, but given the nature of the work, the greens will remain out of action for a significant period of time. All of the greens will be verti drained with 12mm tines towards the end of this month. This will enable us to start the winter maintenance programme of monthly slit tining until the end of January 2014, after which we will move to using solid round 10mm tines through into the spring and on the same rotation. Throughout the winter period, all greens and collars will receive a monthly application of chelated iron and seaweed in order to harden the turf and sustain and maintain a healthy turf throughout the winter period. The chelated iron also has a mild suppressant action on any fungal activity. Tees All tees are currently being cut with pedestrian mowers at 8mm twice a week. This significantly improves the presentation and quality of the surface. This height of cut will increase over the coming weeks to 10mm, which is our consistent, usual winter height. The tees are divoted twice a week alongside the regular general maintenance of emptying all litter bins and cleaning around the marker stones. Aeration throughout the winter period forms a similar programme to that of the greens and will be undertaken and completed on a 3-4 week cycle basis. Worm activity is a particular problem on some tees and in the past we have used chemical to combat the problem. However, this year we have tried a new product which is completely organic, and the first signs are promising. I will be monitoring the progress of this product over the winter period. Over the coming weeks we will move tee balls onto the winter tee areas in order to give the main tee areas time to recover ready for next season. We will be completing some re-turfing and targeted renovation work on some of the more damaged tees. Fairways Over the last two seasons I have been especially pleased with the condition of the fairways, particularly in terms of the percentages of the finer grasses and the way in which they have held up through some extremes of weather. The work that has gone into these fairways over the last seven years can not and should not be underestimated, especially in terms of over-seeding, aeration and wetting agent application. We are currently cutting fairways at 14mm as and when needed; at this time of year, one of our biggest problems and challenges is to get a clean cut as there is still growth that warrants and requires cutting. For example, inevitably, there are leaves and other debris on the surface which have to be cleared, whilst additionally the surface remains very wet; therefore the quality of cut is closely monitored in order that the clean cut is achieved. Areas of weaker growth have been over-seeded and top dressed to improve sward composition. Rough We have recently been scarifying and cutting areas of the ecology rough which have become too dense and populated with the wrong type of grasses. By completing this work on a regular basis it encourages a more open sward that is dominated by the finer grasses and therefore makes ball retrieval easier. It also results in the maintenance of our ecology rough, which creates excellent definition to the courses. The annual heather cutting and seed harvesting will begin during November; areas of heather are cut on a two year rotation. The harvested seed is used for heathland establishment and we also supply other golf courses with seed, as well as Natural England sites, which are undertaking heathland regeneration. Over the last month we have been busy cutting down bramble areas within the woodland; over the last two years brambles have been really very aggressive in their growth habit so we have taken the opportunity to get on top of some of these areas by including their regular maintenance into the ongoing programme. In some of the more prominent areas we will be spraying the brambles with herbicide in the spring to reduce any new growth. General Kelvin Cowley is our new apprentice. He started with us in September and has settled in well. The search for a second apprentice has been a little slower to gain momentum, but we are conducting initial interviews next week (w/c 21st October 2013) with candidates sourced via the National Apprenticeships website; the Apprenticeship has also has been advertised in conjunction with Rodbaston College. I am anticipating that the second apprentice should be identified and appointed via these interviews and will therefore be in post during December. I have also researched the viability of using a mechanic from a local machinery supplier. The role would be based on the mechanic working on-site on a weekly basis, to help with the all-important general machinery maintenance (this was discussed at a meeting held on 20th September). The need to maintain our existing fleet in prime condition is paramount to the standards we set on the courses. Machines and particularly cutting machines, have to be set-up correctly and available for the task every time that they required. Our mechanic currently works a three day week, but we are finding there is an increasing need for the greenkeeping team to get involved with machinery maintenance when our mechanic isn’t on-site, which has the knock-on effect of taking them away from there required duties. I have approached two of our suppliers and they have provided costings, based on the provision of a mechanic on an hourly basis and on a routine and frequency specified by me. The rate is £30 per hour, plus traveling expenses, so £240 per day, plus expenses. Initially I would like to recommend that we use this resource at a rate of four days per month, based on a 4-week month, so approximately 1 day per week. For the longer term I will look into other options for staffing that will continue to improve the provision of excellent maintenance of the machinery. Jonathan Wood Course Manager Enville Golf Club 07977448149 jw@j-wood.co.uk